Goals & steps
Projects, in plain words.
A project is a list of goals. Each goal is a list of steps. Each step has an owner, a date, a checklist, files, and a conversation. That is the whole model, and it fits on a phone.
Send the deck
SamTodayTasks 1/3📎 2Confirm crew for Tuesday
UnassignedFriTasks 0/2Order shingles
MariaDoneTasks 2/2📎 1
What it does
Everything on the card
Owner, due date, priority, task count, and an attachment mark, visible without opening the step. Unassigned steps say so, loudly.
Paste a screenshot
Onto a step, into a comment, or in a message. It lands where you pasted it, with a thumbnail.
@mention anyone
Type @ and pick a teammate. They get a notification and, if they switched it on, a text.
Tasks inside steps
Link an existing task or make a new one right on the step. Tick it off there or in your task list; both stay in sync.
Drag to reorder, filter to focus
Order steps by hand. Filter by owner, status, priority, or “mine”. Roll-ups show what is late and what is unowned.
Trig watches the goal
A step past its date, a goal nobody touched in two weeks, a step with no owner three days out. Trig flags each once, and can assign it if you let it.
What that means for you
- Nobody has to learn a project methodology to know what to do next.
- A late or unowned step is visible from the list, not buried in a card.
- The conversation about the work lives on the work, with the screenshots.
- Trig can create the follow-up step and assign it, with an undo.
- Smart import from a document or spreadsheet is on the way for bringing in a plan you already have.
You started the business.
This is where you run it.
Tell us what you do and see your workspace today. Free for 14 days; your card isn’t charged until the trial ends.